Official website of Ski Lifts of 4 Vallées

MENU LIVE
/ / [INFO] Savoleyres cable car set to open
News

[INFO] Savoleyres cable car set to open

Scheduled opening of the lift on Saturday 3rd August 10-07-2019 16:00
[INFO] Savoleyres cable car set to open-45777

As announced previously, works need to be undertaken on the cable car between Les Creux and Savoleyres as a result of changes to technical standards. Given the old age of the cable car, the components we need are no longer stocked, which means we have to have them manufactured. This production process is now under way.

Our maintenance teams will receive the pieces during the month of July and do their best to install them as quickly as possible. If everything goes as planned, we will be able to open the cable car again on Saturday, 3 August.

From 22nd July 20th July to 2nd August, a shuttle bus service will run between Carrefour and La Croix-de-Cœur every 30 minutes, free of charge. From Savoleyres, La Croix-de-Cœur can be reached by hiking trail in about 20 minutes. From Carrefour, there will be connections to the main areas in Verbier, including Médran, from where the cable car to Les Ruinettes departs.

Thank you for your understanding and we wish you a wonderful summer!                                                             

Thyon Veysonnaz Nendaz Verbier
© Copyright 4 Vallées
Réalisation et hébergement : B4F